In the second half of 2017, we were granted a great opportunity: to ship 480 loads of concrete elements from the factory in Germany to a project in Lelystad, all with real-time delivery! Thanks to good preparation and a strict timetable, we were able to complete the job in a few months, much to our client’s satisfaction.
Active throughout Europe
Central location in the Netherlands
No challenge too crazy
Flexible in execution
Copyright: G. Vlastuin transport
Design & realisatie: HETWORKS